Showing all 6 results
FA/EV - FAa/EV
The activated sludge pilot plant consists of an oxidation reactor, of a settler and of a final chlorination tank, according to the traditional diagram of single-stage […]
MFA-3/EV
The activated sludge pilot plant consists of an oxidation reactor and of a settler according to the traditional diagram of singlestage sewage treatment process.
FA1C/EV
The activated sludge pilot plant consists of an oxidation reactor and of a settler according to the traditional diagram of single-stage sewage treatment process.
BIO/EV - BIOa/EV
This pilot plant consists of a reactor with built-in settler and floating head for hydraulic guard.
BIO1C/EV
This pilot plant consists of a reactor with built-in settler.
DE/EV - DE1/EV - DE2/EV
This equipment consists of a service unit (DE/EV) including two peristaltic pumps (for feeding and recycle) of variable speed and a compressor with flowmeter that can […]